Skip to product information
Keepro Hybrid Air Hose, Flexible 1/4 Inch ID By 10 Feet Long Lead-in Short Air Compressor Hose with Swivel Solid Brass 1/4" Industrial Quick Coupler and Plug, 300 PSI Maximum Pressure, Red - size: 10 FT
$27.52
About this item
- SPECIFICATIONS: Heavy-duty 1/4-inch ID hybrid air hose designed for professional use with a maximum pressure rating of 300 PSI
- DURABILITY: Flexible red rubber and pvc construction resists kinking, coiling, and weather damage while maintaining excellent flexibility at -40 to 150 degree F.
- CONNECTIONS: Features SWIVEL solid brass fittings on both ends with sturdy strain relief grips for secure attachment to air tools and compressors.
- VERSATILITY: Perfect for use with nail guns, impact wrenches, spray guns, and other pneumatic tools requiring consistent air pressure
- DESIGN: High-visibility red color enhances workplace safety and makes the hose easy to locate on job sites
Overview
- Brand: Keepro
- Material: Brass, Hybrid Rubber and PVC
- Color: Red
- Product Dimensions: 10"L x 0.75"W
- Maximum Pressure: 300 psi
- Nominal Wall Thickness: 0.375 inches
- Outside Diameter: 0.75 inches
- Item Length: 10 inches
- Manufacturer: Keepro
- Number of Packs: 1